Project specification
- Model supplied
- Blackwell B110
- Prime power rating
- 100 kVA
- Customer sector
- Renewable energy installation
- Requirement
- Urgent diesel generator supply
- Turnaround
- Within 12 hours
- Handover
- Customer collection from the FW Power depot
An urgent 100 kVA requirement
When a renewable energy installation specialist urgently needed a 100 kVA diesel generator, speed was essential. The business serves domestic and commercial customers, installing solar panels, battery storage, EV charging points, air source heat pumps and air conditioning.
The customer needed a supplier who could respond quickly and get the generator prepared for collection. Blackwell and FW Power rose to the challenge, completing the supply turnaround within 12 hours.
The solution: Blackwell B110
We supplied a Blackwell B110 diesel generator, rated at 100 kVA prime. With the unit available, the focus moved straight to preparing it for handover and completing its pre-delivery inspection.
Close coordination between sales and operations kept the order moving, with the workshop preparation and collection arrangements managed around the customer's urgent timeframe.
Commitment from sales to senior management
Adam Lavin was out of the office when the urgent enquiry arrived, but remained fully committed to helping the customer. He did everything in his power to secure the order and keep it moving, showing the dedication and responsiveness that an urgent requirement demands.
Our Managing Director, Eren Emre, also provided tremendous support while on a business trip in Asia. Despite his overseas commitments, he continued to support the team and help make this rapid response possible.
Adam's determination to close the deal, Eren's backing and the practical work of Gavin Dean and his operations team brought the whole business together around one goal: getting the customer's generator supplied within the required timeframe.
Gavin Dean and the team made it happen
Special recognition goes to Gavin Dean, our Operations Manager, and the entire FW Power operations team. Gavin coordinated the preparation and handover, while the team came in early and prioritised the work needed to get the generator ready.
Their effort turned an urgent request into a completed supply within 12 hours. From the pre-delivery inspection to getting the generator ready for collection, the team pulled together to meet the deadline.
This was an excellent example of the commitment behind every Blackwell generator we supply. Having the equipment available was only part of the story; Gavin and his team's organisation, practical expertise and willingness to go the extra mile made the rapid turnaround possible.
Prepared, collected and on its way
With preparation completed, the Blackwell B110 was collected from the FW Power depot for its onward journey. The photographs show the collection vehicle at the yard and the generator loaded for departure.
For a customer working to an urgent deadline, a responsive team and a clear route from order to collection made all the difference. A huge thank you to Adam Lavin, Eren Emre, Gavin Dean and the entire team for going the extra mile and making it happen.
Need a diesel generator urgently?
Speak to the Blackwell team with your required power rating, location and collection or delivery deadline. We will check current availability and confirm the quickest practical route to supply.
This project's 12-hour turnaround shows what a coordinated team can achieve. Timing for each new enquiry is confirmed against stock, preparation requirements and transport arrangements.
Supplied and prepared by FW Power
Gavin Dean and the FW Power operations team coordinated the preparation, pre-delivery inspection and collection of the Blackwell B110. Visit FW Power Generators.